This project consists of ditch excavation of new drainage system including inlets, reinforced concrete pipe and concrete rip rap work at every roadway crossing. Other improvements include pavement repair, roadside swales, boring under irrigation district canal, fence relocation, traffic control and storm water pollution prevention.